Invitation to Chinese EPCF partners
Inside the solar plant100 MWp
Explore an Iranian solar project from module to grid. We invite a priced turnkey proposal covering engineering, procurement, construction and finance.
Open supplier request↘
Where could it be built?
The red scale maps modelled specific PV yield from the Global Solar Atlas. Compare regions at this stage. A parcel will be selected after the partner’s technical and financial response.
Solargis / Global Solar Atlas, World Bank–ESMAP. Long-term average for 1999–2018, released October 2019. Natural Earth boundaries. The constant thickness of the tilted model is purely illustrative.
From sunlight to grid export
Select a month to see mean hourly global horizontal irradiance in a typical meteorological year and how daylight varies through the day.
Hourly irradiance
Monthly mean profile in the typical year, W/m²Trace the power path
Select a component in this example with AC-coupled storage to see what it does.
What does storage deliver?
SATBA reported a large-plant connection requirement of at least twenty per cent of capacity for two hours. On a 100 MW connection basis, the example gives 20 MW and 40 MWh. The connection approval determines the final basis.
Who buys the electricity?
Choose a sales route to compare its pricing basis, contractual commitments and payment risk.
Navoi’s operating record
The contract used a 100 MW benchmark. The completed plant had 132 MWdc of modules and 115 MWac of installed equipment. Construction took one year.
Historical completion-report figures. The residual is calculated from the total after EPC and disclosed finance costs.
Navoi annual net output
GWh delivered to the gridCapital and repayment
Use these proposed terms to price the offer. Land rights, the cash contribution and bank acceptance each require supporting documentation.
On the component bench
Two examples for comparing datasheets. Check module power, string voltage compatibility and AC output at site temperature for the chosen design.

Dust and water in the operating budget
Navoi’s appraisal estimated 4,620 m³ of water per year for wet cleaning. Choose a cleaning schedule using measured losses, rainfall, available water and the value of recovered output. Maintenance helps preserve performance; output still varies.
The Iran solar research dossier
Seven technical and commercial chapters with original documents, reference data and limits of comparison.
Request for an EPCF proposal
The offer should let the buyer compare price, performance, delivery dates and the effective cost of finance on a consistent basis.
Open the downloaded form on your computer, add equipment lines and save the completed copy for return through your business correspondence.